Wednesday, February 12, 2025, beginning at 4 am construction crews will be on-site and warming up their equipment before the construction of the CSX jump span assemblies which will occur from 5 am to 5 pm. Installing the jump span assemblies will involve trackwork, excavation, and setting and detailing of the jump spans including welding. None of the jump span work should generate sound and vibration to the same levels as the pile driving work previously executed back in December and early January.